Repairing brick footings and oak sole plates

Because the floor was due to be replaced and lowered 8 inches, it was imperative to deepen and strengthen the footings, which were mostly only two or three bricks deep.  They were built down a metre by digging a trench in sections around the house. New bricks were laid almost direct onto the clay, on a thin layer of limecrete.

Building new brick footings upwards from a trench dug into the clay. A rotten oak sole plate, yet to be removed, can be seen above the bricks.

Most of the oak sole plates supporting the walls, laid onto the old brick footings, were rotten. They were replaced with the same wood, oak. Continue reading “Repairing brick footings and oak sole plates”

First stage repairs

BASIC WORK ON THE OLD BUILDING

2007-9

We gained planning permission and listed building consent for structural repairs to the building, installation of services, a new vehicle entrance and construction of a cart-lodge style garage and also a small extension – essentially, a porch, though with a shower room squeezed in. We decided we would split this into several phases, leaving the porch extension, some of the repair work and the garage until later.

The repairs under Phase I were undertaken by Robert Norman Construction of Framlingham. The main items were: Continue reading “First stage repairs”