Skip to content

saving The Old Brewhouse

repairing and extending a listed building

  • Home page
    • People
    • Old photos
  • All posts
  • Repairing
    • Repairs before we bought
  • Extending
    • Photo gallery – the extension
  • Techniques
    • Wattle and daub
    • Limewash
    • Lime plaster and render
    • Limecrete
    • Lime developments
    • Energy efficiency
    • Oak repairs
    • Brick footings
  • Repair philosophy
    • Grade II listing
    • University of East Anglia doctoral thesis
    • Plan of the site
    • Costs
    • Buying and planning permission

Tag: Distemper

Distemper

Distemper

According to one Suffolk expert, limewash was not used inside homes. If true, then we’ve been doing it wrongly for years. Instead distemper made from chalk and milk casein is said to have been the covering of choice, so this winter we’ve tried it. Continue reading “Distemper”

Unknown's avatarAuthor PDRPosted on February 18, 2018February 16, 2021Categories Distemper, Limewash, Repairing the old house, TechniquesTags Distemper, emulsion, Glemsford, Ingilby, limewash4 Comments on Distemper

By subject

  • Repairing the old house (51)
  • Techniques (44)
    • Brick footings (2)
    • Distemper (1)
    • Drains (3)
    • Energy efficiency (5)
    • Floor repairs (2)
    • Foundations (1)
    • Lime developments (2)
    • Lime plaster and render (8)
    • Limecrete (2)
    • Limewash (5)
    • Oak repairs (9)
    • Wattle and daub (9)
    • Windows (3)
  • The extension (13)
  • The garden,pond,garage (6)

Recent posts

  • Another round of work needed
  • New light on repairs before we bought
  • Fire safety
  • Plastering over the cracks
  • Housepecker break in
  • Evil wood-burning stoves
  • Secondary glazing on old windows
  • Long-lasting lime plaster for repairs
  • A freezing draft and a hidden window
  • Last part of the old plan
  • Beautiful boulder clay
  • Flashback – the orchids that nearly stopped our project
  • Updating an old door without replacing it
  • Consult planners before you apply
  • Ancient drains
  • Oak, elm or something else?
  • Repairing the floor – 3
  • Repairing the floor – 2
  • Repairing the floor – 1
  • New design
  • Old floorboards
  • Cracks
  • Distemper
  • Lesser spotted housepeckers
  • Brewhouses, dairies and servants’ quarters
  • Take time to sit back and enjoy
  • Limewash over emulsion paint 
  • Rat assault 
  • Old fashioned paint
  • Repairing the damage 
All material © Peter Rodgers

Archive

Blogroll

  • pond blog Saving an ancient Suffolk pond 0
  • the garden at The Old Brewhouse water and wild flowers 0
  • tide by tide ….exploring by boat 0

Search here

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 29 other subscribers
  • Home page
    • People
    • Old photos
  • All posts
  • Repairing
    • Repairs before we bought
  • Extending
    • Photo gallery – the extension
  • Techniques
    • Wattle and daub
    • Limewash
    • Lime plaster and render
    • Limecrete
    • Lime developments
    • Energy efficiency
    • Oak repairs
    • Brick footings
  • Repair philosophy
    • Grade II listing
    • University of East Anglia doctoral thesis
    • Plan of the site
    • Costs
    • Buying and planning permission
saving The Old Brewhouse Blog at WordPress.com.
  • Subscribe Subscribed
    • saving The Old Brewhouse
    • Join 29 other subscribers
    • Already have a WordPress.com account? Log in now.
    • saving The Old Brewhouse
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...